Who runs the marina in Whitby?
North Yorkshire Council owns and runs Whitby Harbour, including the marina pontoons in the upper harbour. Berths are allocated from the council's waiting list.
Moorings in Whitby: North Yorkshire Council's marina pontoons above the swing bridge on the River Esk, and drying chain moorings in the lower harbour.
Area
North Yorkshire, Yorkshire & The Humber
Type
Coastal
Waterways
Not listed
Moorings
0 listed
Location guide
Whitby is a harbour town on the North Yorkshire coast, at the mouth of the River Esk. Moorings in Whitby are all let by North Yorkshire Council, which owns and runs the harbour: marina pontoons in the upper harbour above the swing bridge, and drying chain moorings below it. About 350 leisure craft are kept here.
Berths are allocated from the council's waiting list, which is joined with an application form. The berthing season runs from 1 April to 31 October and winter mooring, 1 November to 31 March, is optional. Berth holders sign a contract and must show third party insurance of at least £3,000,000.
The harbour limits run upriver as far as Ruswarp Weir. Boats call the watchkeepers on VHF channel 11 before entering. The entrance channel is kept, as far as possible, at 1.4m below chart datum, and the council advises small craft not to enter in strong onshore winds from the north-west to the east.
The swing bridge, built in 1908, stuck repeatedly in the hot weather of summer 2026. The Whitby Harbour Users Group was told in July 2026 that major maintenance is planned for 2027, with closures lasting months, though not continuous and outside the main summer season. No dates had been published then, so berth holders above the bridge should ask the harbour office how openings will be affected.
Last checked October 2026
We’re onboarding mooring sites in Whitby. Browse all current listings in the meantime.
Browse available mooringsNorth Yorkshire Council owns and runs Whitby Harbour, including the marina pontoons in the upper harbour. Berths are allocated from the council's waiting list.
The bridge opens on request on VHF channel 11, on the hour and half hour, for two hours either side of high water. A boat arriving outside those times waits at the fish quay or the east side waiting pontoon.
The west side berths in the upper harbour are dredged to 1.5m below chart datum. The drying pontoon and the lower harbour chain moorings at Tate Hill, St Annes and St Mikes dry out, so they suit boats that can take the ground.
Yes, on most berths. The berthing season is 1 April to 31 October and winter mooring from 1 November to 31 March is optional, but the Tate Hill and St Annes chain moorings are let for the summer season only.
Related reading