Is there a marina in Brighton?
Yes. Brighton Marina is half a mile east of the city and is run by Premier Marinas. It has over 1,300 berths, a locked Inner Harbour and a boatyard with a 60-tonne hoist.
Moorings in Brighton are at Brighton Marina, run by Premier Marinas: over 1,300 berths, a locked Inner Harbour, a boatyard and an entrance that silts.
Area
East Sussex, South East England
Type
Coastal
Waterways
Not listed
Moorings
0 listed
Location guide
Moorings in Brighton mean Brighton Marina, on the Sussex coast half a mile east of the city. It lies under white cliffs behind an east and a west breakwater, and opens straight onto the English Channel. Its entrance silts up and has to be dredged, which is the main thing to understand before keeping a boat here.
The marina needs regular dredging to stay open at all states of the tide. A ten-year licence to dredge and to place the silt off Rottingdean was granted in May 2025 and quashed in November 2025, after a legal challenge by Sussex Wildlife Trust. Premier's request for a one-year licence, made in January 2026, was on hold in September 2026.
Premier said in September 2026 that it hoped to apply in November 2026 to use a disposal site off Newhaven instead, and was aiming to start dredging again in spring 2027. Until then, read the marina's notices to mariners for the latest depths before choosing a berth for a deep-keeled boat.
Last checked October 2026
We’re onboarding mooring sites in Brighton. Browse all current listings in the meantime.
Browse available mooringsYes. Brighton Marina is half a mile east of the city and is run by Premier Marinas. It has over 1,300 berths, a locked Inner Harbour and a boatyard with a 60-tonne hoist.
Not always. The entrance channel is dredged to 1.7m below chart datum, and Premier Marinas advises boats drawing more than 1m to wait at least two hours either side of low water before moving in the marina.
The entrance was last dredged in mid-2025. The ten-year dredging licence was quashed in November 2025, and Premier Marinas said in September 2026 that it was aiming to start dredging again in spring 2027, using a disposal site off Newhaven if a new licence is granted.
No. It is reached through lock gates on the east side of the marina, and the lock works on demand from 7am to 7pm all year. Later lockings can be arranged in summer.
Related reading